• Dalyellup College Stage 2
  • Dalyellup College Stage 2
  • Dalyellup College Stage 2
  • Dalyellup College Stage 2

    The Stage Two works on Dalyellup College included the construction of two new double storey learning centres on the eastern side of the campus and a single storey Design and Technology facility on the north western side of the campus. In addition, new tennis courts, a hockey pitch, extensive landscaping and additional parking have been built. The existing reception area has been enlarged and modified and some teaching areas in the original middle school have been modified to suit changing uses and teaching methods.

    The new buildings provide state of the art facilities in the use of technology, science, computing, design and technology, with the overall layout providing more flexible learning and teaching spaces for up to 1200 year 7 to 12 students.